Building a second Stadium Station was not part of the representative project included in the voter-approved ST3 plan. However, the plan did assume that the existing Stadium Station would be rebuilt in roughly the same location to accommodate construction of the new tunnel to Ballard. This reconstruction would be necessary for the Chinatown-International District Segment 4th Avenue Shallow Alternative.
The ST3 plan assumed that the Stadium Station would only serve the line between West Seattle and Everett (since the Ballard line would be transitioning to a tunnel at that location).
ESPAÑOL
Para información acerca del proyecto llame al: 1-800-823-9230. Para traducir todo este sitio al español, haga clic en la barra “Select Language” en el ángulo superior derecho.
TIẾNG VIỆT
Để biết thêm thông tin về dự án này, hãy gọi: 1-800-823-9230. Để dịch toàn bộ trang này sang Tiếng Việt, hãy bấm vào “Select Language” ở góc phải bên trên.
Чтобы узнать подробнее о проекте, звоните: 1-800-823-9230. Чтобы перевести весь сайт на русский язык, нажмите на кнопку «Select Language» в правом верхнем углу.
Tagalog
Para sa impormasyon tungkol sa proyekto, tumawag sa: 1-800-823-9230. Upang isalin ang buong site na ito sa Tagalog, mag-click sa "Select Language" bar sa kanang itaas na sulok.
Korean
프로젝트 정보에 대해서는 전화 1-800-823-9230으로 문의하십시오. 전체 사이트를 한국어로 번역하려면 상단 오른쪽 모서리에 있는 "언어 선택" 바를 클릭하십시오.